Wednesday 30 June 2010

Noahs Ark in Perth

www.microlodge.co.uk

Well done to Noahs Ark. From field to 4 star site in 12 months, as awarded by Visit Scotland yesterday.

Friday 18 June 2010

Summer Showers

www.microlodge.co.uk


It's sunny in Scotland and the campaign for World Cup Footie in the workshop has led to a drop in productivity but a great rise in morale.
After a slow start awaiting some bits and pieces, we eventually finished the Hobbit Cascade stand-alone shower unit to complement the Wee Hobbit.

Wednesday 16 June 2010

New Website Layout

www.microlodge.co.uk

Ah well, A nice 4 day break with a wee run down to Stamford. Very relaxing apart from the 700 mile drive there and back, then all too soon, a return to the workshop. Meanwhile, Gary is still 'sunning it up' in Turkey.
At last, the shower tray arrived for the Hobbit Cascade, so that was fitted today, and all the wall structure is now up.
Tomorrow, we get the shower door fitted and the internal walls lined.
Can't wait to see it all finished.

Thursday 10 June 2010

Official Sponsors of 'Watch World Cup in the Workshop'

  www.microlodge.co.uk



Ok,so it was never going to be a mutiny as such, but in the better interest of the boys, the tv is now installed in the workshop so we can watch whilst we work.
The Hobbit Cascade is in its final stages and should be ready for it's debut appearance by midweek.


Thursday 3 June 2010

The Chosen Name for new Microlodge Loo

www.microlodge.co.uk

At last, the loo is built and now christened, so welcome to the WEE HOBBIT.